VotedBy VotedBy ⌕
Election Day · Tue, Nov 3See how your members of Congress voted →

H.R. 2749 · 118th Congress

Efficient Grid Interconnection Act of 2023

Key: what the circles and colors mean

Each circle is a bill. The ring fills as it moves through Congress:

IntroducedPassed one chamberPassed both chambersBecame law (gold)Resolution agreed to (full, dark)Failed or vetoed (gray)

Under the number: the Yea · Nay count of its final (or latest) recorded vote. On a member's page, the small badge is how that member voted: Y Yea / Aye, N Nay / No, P Present, – Not voting.

Gold and violet are only for Yea and Nay; they never mean a party. A member's party is the letter on their photo.

Never voted on. It didn't reach a floor vote before the 118th Congress ended, so it expired. A bill has to be introduced again to be considered in a new Congress.

2 cosponsors · 2 D

2 signed on when it was introduced; the rest joined later. Cosponsors who withdrew aren't shown.

This bill establishes requirements concerning (1) the equitable allocation of costs for electric grid upgrades; and (2) the deployment of grid enhancing technology or equipment that increases the capacity, efficiency, or reliability of a transmission facility or transmission system.

What it does: CRS summary · Introduced in House · Apr 20, 2023

Efficient Grid Interconnection Act of 2023

This bill establishes requirements concerning (1) the equitable allocation of costs for electric grid upgrades; and (2) the deployment of grid enhancing technology or equipment that increases the capacity, efficiency, or reliability of a transmission facility or transmission system.

Specifically, it directs the Federal Energy Regulatory Commission (FERC) to issue regulations that require public electric utilities to allocate the cost of upgrades to the electric grid, such as upgrades to interconnect renewable generation projects, among all customers that benefit from the upgrades. In determining which parties benefit, FERC must consider all material benefits of the network upgrade, including environmental benefits and those that cannot be directly quantified.

In addition, FERC must issue regulations that apply to regional transmission organizations, independent system operators, or transmission planning coordinators when they are processing requests to interconnect generation projects or energy storage projects to the electric grid. The regulations must require such organizations, operators, and coordinators to study deploying technology or equipment that increases the capacity, efficiency, or reliability of a transmission facility or transmission system.

Written by the nonpartisan Congressional Research Service. All summary versions on Congress.gov

About this bill and sources

Official title: Efficient Grid Interconnection Act of 2023

Latest action (Apr 20, 2023): Referred to the House Committee on Energy and Commerce.

Policy area: Energy · Origin: House · Introduced: Apr 20, 2023

Official page on Congress.gov · Bill text (GovInfo) · Status record (XML)

No recorded floor vote found.