VotedBy VotedBy ⌕
Election Day · Tue, Nov 3See how your members of Congress voted →

H.R. 1514 · 117th Congress

POWER ON Act

Key: what the circles and colors mean

Each circle is a bill. The ring fills as it moves through Congress:

IntroducedPassed one chamberPassed both chambersBecame law (gold)Resolution agreed to (full, dark)Failed or vetoed (gray)

Under the number: the Yea · Nay count of its final (or latest) recorded vote. On a member's page, the small badge is how that member voted: Y Yea / Aye, N Nay / No, P Present, – Not voting.

Gold and violet are only for Yea and Nay; they never mean a party. A member's party is the letter on their photo.

Never voted on. It didn't reach a floor vote before the 117th Congress ended, so it expired. A bill has to be introduced again to be considered in a new Congress.

5 cosponsors · 5 D

0 signed on when it was introduced; the rest joined later. Cosponsors who withdrew aren't shown.

Prevent Outages With Energy Resilient Options Nationwide Act or the POWER ON Act

What it does: CRS summary · Introduced in House · Mar 2, 2021

Prevent Outages With Energy Resilient Options Nationwide Act or the POWER ON Act

This bill revises requirements governing the designation of a national interest electric transmission corridor. Currently, the Department of Energy (DOE) may designate any geographic area experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers.

The bill expands the list of considerations DOE may use to select and designate a corridor. Specifically, DOE may consider whether the designation would (1) enhance the ability of facilities that generate or transmit renewable energy, low-emission energy, or emission-free energy to connect to the electric grid; (2) promote electrification of other sectors, including the transportation sector; or (3) facilitate other public policies to decarbonize the grid. DOE may also consider whether the designation maximizes existing rights-of-way, avoids sensitive environmental areas and cultural heritage sites, and would lower the cost of electricity for consumers.

The bill also revises the authority (i.e., backstop authority) of the Federal Energy Regulatory Commission (FERC) to issue a permit for interstate transmission projects in such corridors when states and local governments fail to do so, including by specifying the timing for when FERC may issue such permits. In addition, the bill requires permit holders to make good faith efforts to engage landowners and other stakeholders early before exercising the right of eminent domain to purchase property needed to complete permit projects.

Finally, the bill requires DOE to provide technical assistance to regional transmission siting agencies.

Written by the nonpartisan Congressional Research Service. All summary versions on Congress.gov

About this bill and sources

Official title: POWER ON Act

Also known as: Prevent Outages With Energy Resilient Options Nationwide Act

Latest action (Mar 3, 2021): Referred to the Subcommittee on Energy.

Policy area: Energy · Origin: House · Introduced: Mar 2, 2021