H.R. 3937 · 116th Congress
To redesignate the facility of the Bureau of Reclamation located at Highway-155, Coulee Dam, WA 99116, as the…
Full title
To redesignate the facility of the Bureau of Reclamation located at Highway-155, Coulee Dam, WA 99116, as the "Nathaniel 'Nat' Washington Power Plant".
Key: what the circles and colors mean
Each circle is a bill. The ring fills as it moves through Congress:
Under the number: the Yea · Nay count of its final (or latest) recorded vote. On a member's page, the small badge is how that member voted: Y Yea / Aye, N Nay / No, P Present, – Not voting.
Gold and violet are only for Yea and Nay; they never mean a party. A member's party is the letter on their photo.
Never voted on. It didn't reach a floor vote before the 116th Congress ended, so it expired. A bill has to be introduced again to be considered in a new Congress.
9 cosponsors · 7 D, 2 R
0 signed on when it was introduced; the rest joined later. Cosponsors who withdrew aren't shown.
This bill designates the Bureau of Reclamation's facility in Coulee Dam, Washington, known as the Third Power Plant, as the Nathaniel "Nat" Washington Power Plant .
What it does: CRS summary · Introduced in House · Jul 24, 2019
This bill designates the Bureau of Reclamation's facility in Coulee Dam, Washington, known as the Third Power Plant, as the Nathaniel "Nat" Washington Power Plant.
Written by the nonpartisan Congressional Research Service. All summary versions on Congress.gov
About this bill and sources
Official title: To redesignate the facility of the Bureau of Reclamation located at Highway-155, Coulee Dam, WA 99116, as the "Nathaniel 'Nat' Washington Power Plant".
Latest action (Jun 25, 2020): Subcommittee Hearings Held.
Policy area: Energy · Origin: House · Introduced: Jul 24, 2019
Official page on Congress.gov · Bill text (GovInfo) · Status record (XML)
No recorded floor vote found.