VotedBy VotedBy ⌕
Election Day · Tue, Nov 3See how your members of Congress voted →

S. 1875 · 115th Congress

Flexible Grid Infrastructure Act of 2017

Key: what the circles and colors mean

Each circle is a bill. The ring fills as it moves through Congress:

IntroducedPassed one chamberPassed both chambersBecame law (gold)Resolution agreed to (full, dark)Failed or vetoed (gray)

Under the number: the Yea · Nay count of its final (or latest) recorded vote. On a member's page, the small badge is how that member voted: Y Yea / Aye, N Nay / No, P Present, – Not voting.

Gold and violet are only for Yea and Nay; they never mean a party. A member's party is the letter on their photo.

Never voted on. It didn't reach a floor vote before the 115th Congress ended, so it expired. A bill has to be introduced again to be considered in a new Congress.

RWD WydenSponsor
1 cosponsor · 1 D

0 signed on when it was introduced; the rest joined later. Cosponsors who withdrew aren't shown.

This bill amends the Energy Policy Act of 2005 to require the Federal Energy Regulatory Commission (FERC) and the Department of Energy (DOE) to address the flexibility, reliability, resilience, affordability, efficiency, and security of the electric grid.

What it does: CRS summary · Introduced in Senate · Sep 27, 2017

Flexible Grid Infrastructure Act of 2017

This bill amends the Energy Policy Act of 2005 to require the Federal Energy Regulatory Commission (FERC) and the Department of Energy (DOE) to address the flexibility, reliability, resilience, affordability, efficiency, and security of the electric grid. Specifically, FERC and DOE must: (1) access the technical and economic potential of distributed energy resources, and (2) establish an online clearinghouse of data relating to distributed energy resources. A distributed energy resource means an electric device that can produce or consume energy that is located on the grid distribution system or on the customer side of the electric grid (e.g., solar roofs).

DOE must also:

  • provide technical assistance, an action plan, tools, and information relating to the deployment of distributed energy resources and grid-scale energy storage;
  • research and develop the electrification of transportation, heating, and other technologies;
  • develop model standards to assist states, electric cooperatives, and publicly owned electric utilities in the voluntary updating of standards for resource and energy assurance planning, ensuring distribution-grid reliability from natural disasters, and improving security;
  • evaluate whether new performance standards and testing procedures are needed to ensure the resilience of electrical equipment to security threats or natural disasters;
  • develop guidelines for calculating the costs and benefits of investments in resilience and security solutions for the electric grid;
  • provide related workforce training; and
  • establish the Flexible Grid Challenge 2022, a grant program that helps states enhance the peak load management and flexibility of the electric grid.

Written by the nonpartisan Congressional Research Service. All summary versions on Congress.gov

About this bill and sources

Official title: Flexible Grid Infrastructure Act of 2017

Latest action (Nov 29, 2018): Committee on Energy and Natural Resources Subcommittee on Energy. Hearings held. With printed Hearing: S.Hrg. 115-534.

Policy area: Energy · Origin: Senate · Introduced: Sep 27, 2017

Official page on Congress.gov · Bill text (GovInfo) · Status record (XML)

No recorded floor vote found.