H.R. 4977 · 115th Congress
Coal Refuse Reclamation Act
Key: what the circles and colors mean
Each circle is a bill. The ring fills as it moves through Congress:
Under the number: the Yea · Nay count of its final (or latest) recorded vote. On a member's page, the small badge is how that member voted: Y Yea / Aye, N Nay / No, P Present, – Not voting.
Gold and violet are only for Yea and Nay; they never mean a party. A member's party is the letter on their photo.
Never voted on. It didn't reach a floor vote before the 115th Congress ended, so it expired. A bill has to be introduced again to be considered in a new Congress.
3 cosponsors · 3 R
0 signed on when it was introduced; the rest joined later. Cosponsors who withdrew aren't shown.
This bill amends the Internal Revenue Code to allow a tax credit for facilities that use coal refuse to produce electricity. The credit is equal to $12 per ton of coal refuse used at a coal refuse facility to produce electricity at the facility during the 10-year period beginning on January 1, 2018.
What it does: CRS summary · Introduced in House · Feb 8, 2018
Coal Refuse Reclamation Act
This bill amends the Internal Revenue Code to allow a tax credit for facilities that use coal refuse to produce electricity. The credit is equal to $12 per ton of coal refuse used at a coal refuse facility to produce electricity at the facility during the 10-year period beginning on January 1, 2018.
To qualify for the credit, the facility must have been originally placed in service prior to January 1, 2018, and combust coal refuse or fuel composed of at least 75% coal refuse by BTU energy value. The facility must also use: (1) at a minimum, a circulating fluidized bed combustion unit or a pressurized fluidized bed combustion unit equipped with a limestone injection system, for control of acid gases; and (2) a fabric filter particulate emission control system.
The bill defines "coal refuse" as any waste coal, rock, shale, slurry, culm, gob, boney, slate, clay and related materials associated with or near a coal seam that are either brought aboveground or otherwise removed from a coal mine in the process of mining coal or that are separated from coal during the cleaning or preparation operations. The term includes underground development wastes, coal processing wastes and excess spoil, but does not include overburden from surface mining activities.
Written by the nonpartisan Congressional Research Service. All summary versions on Congress.gov
About this bill and sources
Official title: Coal Refuse Reclamation Act
Latest action (Feb 8, 2018): Referred to the House Committee on Ways and Means.
Policy area: Taxation · Origin: House · Introduced: Feb 8, 2018
Official page on Congress.gov · Bill text (GovInfo) · Status record (XML)
No recorded floor vote found.