S. 964 · 114th Congress

Nuclear Plant Decommissioning Act of 2015

Key: what the circles and colors mean

Each circle is a bill. The ring fills as it moves through Congress:

IntroducedPassed one chamberPassed both chambersBecame law (gold)Resolution agreed to (full, dark)Failed or vetoed (gray)

Under the number: the Yea · Nay count of its final (or latest) recorded vote. On a member's page, the small badge is how that member voted: Y Yea / Aye, N Nay / No, P Present, – Not voting.

Gold and violet are only for Yea and Nay; they never mean a party. A member's party is the letter on their photo.

Never voted on. It didn't reach a floor vote before the 114th Congress ended, so it expired. A bill has to be introduced again to be considered in a new Congress.

2 cosponsors · 2 D

2 signed on when it was introduced; the rest joined later. Cosponsors who withdrew aren't shown.

Amends the Atomic Energy Act of 1954 to require a Nuclear Regulatory Commission (NRC) licensee, after consulting affected state and local governments, to submit to the NRC a post-shutdown decommissioning activities report (PSDAR) regarding the licensee's shutdown facilities for which a PSDAR is required.

What it does: CRS summary · Introduced in Senate · Apr 15, 2015

Nuclear Plant Decommissioning Act of 2015

Amends the Atomic Energy Act of 1954 to require a Nuclear Regulatory Commission (NRC) licensee, after consulting affected state and local governments, to submit to the NRC a post-shutdown decommissioning activities report (PSDAR) regarding the licensee's shutdown facilities for which a PSDAR is required.

Conditions public availability of the PSDAR upon NRC discretion to redact information necessary to protect the national security.

Requires the NRC to: (1) solicit public comments on the proposed PSDAR; (2) conduct at least two public hearings within the facility's host state; and (3) invite the host state to file a statement of either support, nonsupport, or of conditional support, including specific recommendations for changes.

Directs the NRC, upon receipt of the state's response, to determine, based upon specified considerations, the adequacy or inadequacy of the proposed PSDAR and to issue a decision accordingly.

Prescribes criteria for determining whether a proposed PSDAR is permissible if the host state files a statement of conditional support.

Requires a licensee to submit a new proposed PSDAR if the first one is rejected.

Conditions NRC approval of a proposed PSDAR upon inclusion in the document of a requirement that the licensee comply with applicable state law relating to air, water, or soil quality or radiological standards if that law is more restrictive than its federal counterpart.

Requires the NRC, in the case of existing decommissioning activities, to notify: (1) each licensee of the opportunity to develop a revised PSDAR for any facility for which a PSDAR has been submitted but for which decontamination and dismantlement activities have either not been commenced, or have been commenced for less than one year; and (2) each state within 50 miles of the facility of the opportunity to consult with the licensee.

Written by the nonpartisan Congressional Research Service. All summary versions on Congress.gov

About this bill and sources

Official title: Nuclear Plant Decommissioning Act of 2015

Latest action (Apr 15, 2015): Read twice and referred to the Committee on Environment and Public Works.

Policy area: Energy · Origin: Senate · Introduced: Apr 15, 2015

Official page on Congress.gov · Bill text (GovInfo) · Status record (XML)

No recorded floor vote found.