S. 989 · 111th Congress
Grid Access Act of 2009
Key: what the circles and colors mean
Each circle is a bill. The ring fills as it moves through Congress:
Under the number: the Yea · Nay count of its final (or latest) recorded vote. On a member's page, the small badge is how that member voted: Y Yea / Aye, N Nay / No, P Present, – Not voting.
Gold and violet are only for Yea and Nay; they never mean a party. A member's party is the letter on their photo.
Never voted on. It didn't reach a floor vote before the 111th Congress ended, so it expired. A bill has to be introduced again to be considered in a new Congress.
2 cosponsors · 2 I
2 signed on when it was introduced; the rest joined later. Cosponsors who withdrew aren't shown.
Grid Access Act of 2009 - Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to add definitions of combined heat and power facility as well as net metering.
What it does: CRS summary · Introduced in Senate · May 6, 2009
Grid Access Act of 2009 - Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to add definitions of combined heat and power facility as well as net metering.
Requires each state regulatory authority with ratemaking authority, and each nonregulated electric utility, to conduct a hearing and, on the basis of such hearing, adopt a net metering standard.
Requires retail electric suppliers to offer to arrange to make net metering available to retail customers on a first-come-first-served basis.
Prescribes implementation requirements regarding: (1) net energy measurement; (2) billing practices; (3) ownership of credits; (4) safety and performance standards; and (5) determination of compliance.
Directs the Federal Energy Regulatory Commission (FERC) to publish model interconnection standards, according to specified requirements, for the physical connection between local distribution systems and qualified generation units and electric generation units that are either qualified generation units or combined heat and power facilities. Requires states to adopt such model standards, subject to FERC approval.
Requires each electric utility to allow a combined heat and power facility to site distribution lines on and across public rights-of-way for the purpose of interconnecting with contiguous end use customers. Specifies time limitations for compliance with such siting for combined heat and power facilities.
Requires each state or local electric utility regulatory entity to establish a tariff for electricity produced by clean distributed energy resources that provides for the efficient and effective use of clean distributed energy resources by covered facilities. Prescribes tariff requirements.
Prohibits a state or nonregulated utility from adopting or enforcing any standard or requirement concerning net metering or interconnection that restricts access to the electric power transmission or local distribution system by qualified generators beyond those established under this Act.
Written by the nonpartisan Congressional Research Service. All summary versions on Congress.gov
About this bill and sources
Official title: Grid Access Act of 2009
Latest action (May 6, 2009): Read twice and referred to the Committee on Energy and Natural Resources.
Policy area: Energy · Origin: Senate · Introduced: May 6, 2009
Official page on Congress.gov · Bill text (GovInfo) · Status record (XML)
No recorded floor vote found.