VotedBy VotedBy ⌕
Election Day · Tue, Nov 3See how your members of Congress voted →

S. 3917 · 111th Congress

South Utah Valley Electric Conveyance Act

Key: what the circles and colors mean

Each circle is a bill. The ring fills as it moves through Congress:

IntroducedPassed one chamberPassed both chambersBecame law (gold)Resolution agreed to (full, dark)Failed or vetoed (gray)

Under the number: the Yea · Nay count of its final (or latest) recorded vote. On a member's page, the small badge is how that member voted: Y Yea / Aye, N Nay / No, P Present, – Not voting.

Gold and violet are only for Yea and Nay; they never mean a party. A member's party is the letter on their photo.

Never voted on. It didn't reach a floor vote before the 111th Congress ended, so it expired. A bill has to be introduced again to be considered in a new Congress.

OHR HatchSponsor

No cosponsors.

South Utah Valley Electric Conveyance Act - Requires the Secretary of the Interior, if the Strawberry Water Users Association conveys its interest, if any, in an electric distribution system to the South Utah Valley Electric Service District, and the District agrees to assume from the United States all liability for the administration, operation,…

What it does: CRS summary · Introduced in Senate · Sep 29, 2010

South Utah Valley Electric Conveyance Act - Requires the Secretary of the Interior, if the Strawberry Water Users Association conveys its interest, if any, in an electric distribution system to the South Utah Valley Electric Service District, and the District agrees to assume from the United States all liability for the administration, operation, maintenance, and replacement of the electric distribution system, to convey and assign to the District: (1) all interest of the United States in all fixtures owned by the United States as part of the electric distribution system and the federal lands and interests where the fixtures are located; (2) license for use of the shared power poles; and (3) a license for use and access to all Strawberry Valley Project land and interests in irrigation and power facilities lands on which the electric distribution system is located that are necessary for other Project facilities, including land underlying the Strawberry Substation, if the ownership of such underlying land or interest is retained by the United States, and any corridors in which federal land and interests are abutting public streets and roads and would provide access to those facilities.

Written by the nonpartisan Congressional Research Service. All summary versions on Congress.gov

About this bill and sources

Official title: South Utah Valley Electric Conveyance Act

Latest action (Sep 29, 2010): Read twice and referred to the Committee on Energy and Natural Resources.

Policy area: Public Lands and Natural Resources · Origin: Senate · Introduced: Sep 29, 2010

Official page on Congress.gov · Bill text (GovInfo) · Status record (XML)

No recorded floor vote found.