S. 1471 · 111th Congress
PUMPPS NOLA Act of 2009
Key: what the circles and colors mean
Each circle is a bill. The ring fills as it moves through Congress:
Under the number: the Yea · Nay count of its final (or latest) recorded vote. On a member's page, the small badge is how that member voted: Y Yea / Aye, N Nay / No, P Present, – Not voting.
Gold and violet are only for Yea and Nay; they never mean a party. A member's party is the letter on their photo.
Never voted on. It didn't reach a floor vote before the 111th Congress ended, so it expired. A bill has to be introduced again to be considered in a new Congress.
1 cosponsor · 1 D
1 signed on when it was introduced; the rest joined later. Cosponsors who withdrew aren't shown.
Providing the Utmost safety Measures to the Permanent Protection System in New Orleans, Louisiana or the PUMPPS NOLA Act of 2009 - Modifies the project for permanent pumps and canal modifications at Lake Pontchartrain, Louisiana, to direct the Secretary of the Army, acting through the Chief of Engineers, to: (1) construct a pump station and optimized…
What it does: CRS summary · Introduced in Senate · Jul 20, 2009
Providing the Utmost safety Measures to the Permanent Protection System in New Orleans, Louisiana or the PUMPPS NOLA Act of 2009 - Modifies the project for permanent pumps and canal modifications at Lake Pontchartrain, Louisiana, to direct the Secretary of the Army, acting through the Chief of Engineers, to: (1) construct a pump station and optimized diversion from Hoey's Basin to the Mississippi River to help reduce storm water flow into the 17th Street canal; (2) construct an optimized diversion through the Florida Avenue canal for discharging water into the Inner Harbor Navigation Canal; (3) construct new, permanent pump stations near the lakefront on the 17th Street, Orleans Avenue, and London Avenue canals to provide for future flow capacity; (4) deepen, widen within each existing right-of-way, and line the bottom and side slopes of the 17th Street, Orleans Avenue, and London Avenue canals to allow for a gravity flow of storm water to the pump stations at the lakefront; (5) modify or replace bridges close or adjacent to the 17th Street, Orleans Avenue, and London Avenue canals; (6) remove existing levees and floodwalls that line each side of such canals down to ground grade, if the Secretary determines it to be appropriate; (7) decommission or bypass the interior pump stations of the Sewerage and Water Board of New Orleans that are located at each such canal to maintain the water surface differential across the existing pumping stations until all systems and features are in place to allow for a fully functional system at a lowered canal water surface elevation; and (8) decommission and remove the interim control structures that are located at each such canal.
Conditions initiation of such project on the state of Louisiana agreeing to: (1) pay all costs arising from the operation, maintenance, repair, replacement, and rehabilitation of each completed project component; and (2) hold the U.S. harmless from any claim or damage that may arise from carrying out the project, except with regard to the federal government's negligence.
Written by the nonpartisan Congressional Research Service. All summary versions on Congress.gov
About this bill and sources
Official title: PUMPPS NOLA Act of 2009
Also known as: Providing the Utmost safety Measures to the Permanent Protection System in New Orleans, Louisiana
Latest action (Jul 20, 2009): Read twice and referred to the Committee on Environment and Public Works.
Policy area: Water Resources Development · Origin: Senate · Introduced: Jul 20, 2009
Official page on Congress.gov · Bill text (GovInfo) · Status record (XML)
No recorded floor vote found.