H.R. 864 · 111th Congress

Renewable Fuel Pipelines Act of 2009

Key: what the circles and colors mean

Each circle is a bill. The ring fills as it moves through Congress:

IntroducedPassed one chamberPassed both chambersBecame law (gold)Resolution agreed to (full, dark)Failed or vetoed (gray)

Under the number: the Yea · Nay count of its final (or latest) recorded vote. On a member's page, the small badge is how that member voted: Y Yea / Aye, N Nay / No, P Present, – Not voting.

Gold and violet are only for Yea and Nay; they never mean a party. A member's party is the letter on their photo.

Never voted on. It didn't reach a floor vote before the 111th Congress ended, so it expired. A bill has to be introduced again to be considered in a new Congress.

13 cosponsors · 9 D, 4 R

Renewable Fuel Pipelines Act of 2009 - Amends the Energy Policy Act of 2005 to allow federally-guaranteed loans for renewable fuel pipeline construction without regard to whether an appropriation for the cost has been made. Includes ethanol and biodiesel as renewable fuel.

What it does: CRS summary · Introduced in House · Feb 4, 2009

Renewable Fuel Pipelines Act of 2009 - Amends the Energy Policy Act of 2005 to allow federally-guaranteed loans for renewable fuel pipeline construction without regard to whether an appropriation for the cost has been made. Includes ethanol and biodiesel as renewable fuel.

Allows a maximum guarantee by the Secretary of Energy of 90% of the project cost and more than one guarantee for a project (as long as the total guaranteed amount does not exceed 90%).

Sets forth factors to be considered in guarantee determinations, including volume and quality of fuel, size of markets served, experience of the entity working with renewable fuel, and associated storage, production, and terminal facilities.

Authorizes an entity implementing a fuel pipeline project for which a guarantee is made, when such entity is unable to acquire the necessary right-of-way to construct, operate, and maintain pipelines and the necessary land or property for the location of pump stations, pressure apparatus, and other necessary facilities or equipment by contract, to acquire what is necessary through eminent domain if determined by the Secretary to be necessary or desirable in the public interest.

Authorizes the Secretary to provide grants for renewable fuel pipeline projects to assist in carrying out permit acquisition, planning, and other preparatory activities in advance of participation in the guarantee program. Limits the sum of grants and amounts guaranteed for a project that receives both to 90% of the project's cost.

Written by the nonpartisan Congressional Research Service. All summary versions on Congress.gov

About this bill and sources

Official title: Renewable Fuel Pipelines Act of 2009

Latest action (Feb 9, 2009): Referred to the Subcommittee on Energy and Environment.

Policy area: Energy · Origin: House · Introduced: Feb 4, 2009

Official page on Congress.gov · Bill text (GovInfo) · Status record (XML)

No recorded floor vote found.