VotedBy VotedBy ⌕
Election Day · Tue, Nov 3See how your members of Congress voted →

H.R. 3169 · 111th Congress

To require the Secretary of the Army to carry out a study to determine the most effective manner by which to…

Full title

To require the Secretary of the Army to carry out a study to determine the most effective manner by which to carry out the Lake Pontchartrain flood control project, to authorize the Secretary of the Army to construct a new pumping station at Lake Pontchartrain, Louisiana, and for other purposes.

Key: what the circles and colors mean

Each circle is a bill. The ring fills as it moves through Congress:

IntroducedPassed one chamberPassed both chambersBecame law (gold)Resolution agreed to (full, dark)Failed or vetoed (gray)

Under the number: the Yea · Nay count of its final (or latest) recorded vote. On a member's page, the small badge is how that member voted: Y Yea / Aye, N Nay / No, P Present, – Not voting.

Gold and violet are only for Yea and Nay; they never mean a party. A member's party is the letter on their photo.

Never voted on. It didn't reach a floor vote before the 111th Congress ended, so it expired. A bill has to be introduced again to be considered in a new Congress.

1 cosponsor · 1 R

0 signed on when it was introduced; the rest joined later. Cosponsors who withdrew aren't shown.

Modifies the Lake Pontchartrain flood control project, Louisiana, to authorize the Secretary of the Army to construct a pumping station specifically designed to evacuate storm water from the Hoey's Basin area at a specified cost and federal share.

What it does: CRS summary · Introduced in House · Jul 10, 2009

Modifies the Lake Pontchartrain flood control project, Louisiana, to authorize the Secretary of the Army to construct a pumping station specifically designed to evacuate storm water from the Hoey's Basin area at a specified cost and federal share.

Requires the Secretary to: (1) conduct a study to carry out an analysis of the residual risks associated with specified options described in the project report and an independent peer review of the effectiveness of concept designs and preliminary cost estimates associated with each option; (2) report to specified congressional committees regarding the option that is more technically advantageous and more effective from an operational perspective in providing greater reliability and reducing the risk of flooding to the New Orleans area over the long term and that would increase the overall drainage capacity of the region, reduce local flooding to the greatest extent practicable, and provide the greatest system flexibility; and (3) resume project implementation with that option without regard to the funds available.

Written by the nonpartisan Congressional Research Service. All summary versions on Congress.gov

About this bill and sources

Official title: To require the Secretary of the Army to carry out a study to determine the most effective manner by which to carry out the Lake Pontchartrain flood control project, to authorize the Secretary of the Army to construct a new pumping station at Lake Pontchartrain, Louisiana, and for other purposes.

Latest action (Jul 13, 2009): Referred to the Subcommittee on Water Resources and Environment.

Policy area: Water Resources Development · Origin: House · Introduced: Jul 10, 2009

Official page on Congress.gov · Bill text (GovInfo) · Status record (XML)

No recorded floor vote found.