VotedBy VotedBy ⌕
Election Day · Tue, Nov 3See how your members of Congress voted →

H.R. 829 · 110th Congress

National Interest Electric Transmission Corridor Clarification Act

Key: what the circles and colors mean

Each circle is a bill. The ring fills as it moves through Congress:

IntroducedPassed one chamberPassed both chambersBecame law (gold)Resolution agreed to (full, dark)Failed or vetoed (gray)

Under the number: the Yea · Nay count of its final (or latest) recorded vote. On a member's page, the small badge is how that member voted: Y Yea / Aye, N Nay / No, P Present, – Not voting.

Gold and violet are only for Yea and Nay; they never mean a party. A member's party is the letter on their photo.

Never voted on. It didn't reach a floor vote before the 110th Congress ended, so it expired. A bill has to be introduced again to be considered in a new Congress.

FWR WolfSponsor
13 cosponsors · 8 D, 5 R

5 signed on when it was introduced; the rest joined later. Cosponsors who withdrew aren't shown.

National Interest Electric Transmission Corridor Clarification Act - Amends the Federal Power Act to revise the factors the Secretary of Energy may consider in determining whether to designate a national interest electric transmission corridor.

What it does: CRS summary · Introduced in House · Feb 5, 2007

National Interest Electric Transmission Corridor Clarification Act - Amends the Federal Power Act to revise the factors the Secretary of Energy may consider in determining whether to designate a national interest electric transmission corridor.

Authorizes the Secretary to consider whether the designation would have potential impacts on natural values and special places considered to be in the national interest. Repeals authority to consider whether designation would serve U.S. energy independence.

Directs the Secretary, before a corridor designation, to analyze all alternatives measures that could address energy transmission constraints or congestion.

Prohibits a corridor designation from encompassing, within one mile of their respective boundaries, lands on which development is prohibited or limited to protect scenic, natural, cultural, or historic resources.

Revises conditions for issuance of permits by the Federal Energy Regulatory Commission (FERC) for construction or modification of electric transmission facilities in such a corridor. Requires that a state commission or other state entity with authority to approve facility siting has: (1) disapproved the siting in a decision that FERC considers an abuse of discretion; or (2) unreasonably withheld or delayed making a decision for at least a year.

Requires each permit application to include an engineering study of the feasibility of placing the line underground.

Requires treatment as a taking for which just compensation is due of a diminution of 10% or more in any property value resulting from acquisition of a right-of-way and the construction of a facility on it.

Requires each agency to issue its own record of decision in order to ensure that its environmental review complies with statutory mandates and regulatory requirements.

Repeals any right to appeal to the President an agency denial or failure to act regarding federal authorization for a transmission facility.

Written by the nonpartisan Congressional Research Service. All summary versions on Congress.gov

About this bill and sources

Official title: National Interest Electric Transmission Corridor Clarification Act

Latest action (Feb 6, 2007): Referred to the Subcommittee on Energy and Air Quality.

Policy area: Energy · Origin: House · Introduced: Feb 5, 2007

Official page on Congress.gov · Bill text (GovInfo) · Status record (XML)

No recorded floor vote found.