H.R. 4059 · 110th Congress
Rural Clean Energy Superhighways Act
Key: what the circles and colors mean
Each circle is a bill. The ring fills as it moves through Congress:
Under the number: the Yea · Nay count of its final (or latest) recorded vote. On a member's page, the small badge is how that member voted: Y Yea / Aye, N Nay / No, P Present, – Not voting.
Gold and violet are only for Yea and Nay; they never mean a party. A member's party is the letter on their photo.
Never voted on. It didn't reach a floor vote before the 110th Congress ended, so it expired. A bill has to be introduced again to be considered in a new Congress.
4 cosponsors · 3 D, 1 R
1 signed on when it was introduced; the rest joined later. Cosponsors who withdrew aren't shown.
Rural Clean Energy Superhighways Act - Amends the Federal Power Act to direct the President to designate an area as a National Renewable Energy Zone if it meets specified prerequisites.
What it does: CRS summary · Introduced in House · Nov 1, 2007
Rural Clean Energy Superhighways Act - Amends the Federal Power Act to direct the President to designate an area as a National Renewable Energy Zone if it meets specified prerequisites.
Requires the President, after such designation, to identify, and provide public notice of, additional renewable energy trunkline facilities and network upgrades required to increase substantially the generation of electricity from renewable energy within each Zone.
Directs the Federal Energy Regulatory Commission (FERC) to promulgate regulations to ensure that a public utility that finances transmission capacity to transmit electricity from renewable energy from a Zone to an electricity consuming area recovers through transmission service rates all prudently incurred costs and a reasonable return on equity associated with construction and operation of the new transmission capacity.
Directs FERC, in specified circumstances, to permit a renewable energy trunkline built by a public utility located in a Zone to be initially funded through transmission charges imposed upon: (1) all the utility's transmission customers in advance of significant generation interconnection requests; or (2) all the transmission customers of a Regional Transmission Organization (RTO) or independent system operator, if the trunkline is built in an area served by one or the other.
Prescribes cost allocation procedures for new projects and network upgrades.
Requires a Federal Transmitting Utility (a Federal Power Marketing Administration, including the Tennessee Valley Authority (TVA), that owns or operates electric transmission facilities) to finance a network upgrade or a renewable energy trunkline facility, if within a certain time frame no privately or publicly funded entity commits to do so.
Authorizes the deposit of specified funds in a Transmission Fund in the Treasury for expenditure by the Secretary of Energy in financing network upgrades or trunkline facilities.
Requires the Federal Power Marketing Administrations and TVA to: (1) promote energy conservation and renewable energy electric resource development; and (2) identify opportunities for promoting development of facilities generating electricity from renewable energy on Indian lands.
Authorizes each such entity to acquire, on behalf of the U.S. government, electricity from renewable energy and renewable energy credits.
Written by the nonpartisan Congressional Research Service. All summary versions on Congress.gov
About this bill and sources
Official title: Rural Clean Energy Superhighways Act
Latest action (Nov 7, 2007): Referred to the Subcommittee on Energy and Mineral Resources.
Policy area: Energy · Origin: House · Introduced: Nov 1, 2007
Official page on Congress.gov · Bill text (GovInfo) · Status record (XML)
No recorded floor vote found.