H.R. 6428 · 109th Congress
To authorize the Secretary of the Army to carry out certain elements of the project for hurricane and storm…
Full title
To authorize the Secretary of the Army to carry out certain elements of the project for hurricane and storm damage reduction, Morganza to the Gulf of Mexico, Louisiana.
Key: what the circles and colors mean
Each circle is a bill. The ring fills as it moves through Congress:
Under the number: the Yea · Nay count of its final (or latest) recorded vote. On a member's page, the small badge is how that member voted: Y Yea / Aye, N Nay / No, P Present, – Not voting.
Gold and violet are only for Yea and Nay; they never mean a party. A member's party is the letter on their photo.
Passed the House without a recorded vote, then expired. It passed by voice vote or unanimous consent, which don't record how each member voted, but didn't become law before the 109th Congress ended.
1 cosponsor · 1 D
1 signed on when it was introduced; the rest joined later. Cosponsors who withdrew aren't shown.
- House Introduced Dec 8, 2006
- House Passed Dec 9, 2006
Authorizes the Secretary of the Army to carry out the following elements of the hurricane and storm damage reduction project, Morganza to the Gulf of Mexico, Louisiana, in accordance with the Chief of Engineers' reports of August 23, 2002, and July 22, 2003: (1) the Houma Lock; and (2) the Reach H-3, Reach J-2, Bush Canal floodgate, Point aux Chene…
What it does: CRS summary · Passed House without amendment · Dec 9, 2006
(This measure has not been amended since it was introduced. The summary of that version is repeated here.)
Authorizes the Secretary of the Army to carry out the following elements of the hurricane and storm damage reduction project, Morganza to the Gulf of Mexico, Louisiana, in accordance with the Chief of Engineers' reports of August 23, 2002, and July 22, 2003: (1) the Houma Lock; and (2) the Reach H-3, Reach J-2, Bush Canal floodgate, Point aux Chene floodgate, Reach H-2, Reach J-3, Reach J-1, and Placid Canal.
Directs the Secretary to credit the cost of design and construction work carried out by the non-federal interest before the date of the partnership agreement toward the non-federal share of the cost of such elements upon determining that the work is integral to those elements.
Makes the operation, maintenance, repair, rehabilitation, and replacement of the Houma Navigation Canal lock complex and the Gulf Intracoastal Waterway floodgate features that provide for inland waterway transportation a federal responsibility. Requires: (1) the Secretary to maintain the Houma Navigation Canal at dimensions at least equal to those of the lock; and (2) the lock feature to be implemented under an exclusive partnership agreement.
Written by the nonpartisan Congressional Research Service. All summary versions on Congress.gov
About this bill and sources
Official title: To authorize the Secretary of the Army to carry out certain elements of the project for hurricane and storm damage reduction, Morganza to the Gulf of Mexico, Louisiana.
Latest action (Dec 9, 2006): Received in the Senate.
Policy area: Water Resources Development · Origin: House · Introduced: Dec 8, 2006
Official page on Congress.gov · Bill text (GovInfo) · Status record (XML)
- House Introduced Dec 8, 2006
- House Passed Dec 9, 2006
No recorded floor vote found.