S. 2470 · 108th Congress
A bill to enhance navigation capacity improvements and the ecosystem restoration plan for the Upper…
Full title
A bill to enhance navigation capacity improvements and the ecosystem restoration plan for the Upper Mississippi River and Illinois Waterway System.
Key: what the circles and colors mean
Each circle is a bill. The ring fills as it moves through Congress:
Under the number: the Yea · Nay count of its final (or latest) recorded vote. On a member's page, the small badge is how that member voted: Y Yea / Aye, N Nay / No, P Present, – Not voting.
Gold and violet are only for Yea and Nay; they never mean a party. A member's party is the letter on their photo.
Never voted on. It didn't reach a floor vote before the 108th Congress ended, so it expired. A bill has to be introduced again to be considered in a new Congress.
7 cosponsors · 3 D, 4 R
7 signed on when it was introduced; the rest joined later. Cosponsors who withdrew aren't shown.
Directs the Secretary of the Army (at a specified cost of Treasury funds to be matched by the Inland Waterways Trust Fund, which is paid by private users) to: (1) construct mooring facilities at Locks 12, 14, 18, 20, 22, 24, and LaGrange Lock, provide switch boats at Locks 20 through 25 over five years for project operation, and conduct development and…
What it does: CRS summary · Introduced in Senate · May 20, 2004
Directs the Secretary of the Army (at a specified cost of Treasury funds to be matched by the Inland Waterways Trust Fund, which is paid by private users) to: (1) construct mooring facilities at Locks 12, 14, 18, 20, 22, 24, and LaGrange Lock, provide switch boats at Locks 20 through 25 over five years for project operation, and conduct development and testing of an appointment scheduling system; (2) construct new 1,200-foot locks at Locks 20, 21, 22, 24, and 25 on the Upper Mississippi River and at LaGrange Lock and Peoria Lock on the Illinois Waterway; and (3) conduct mitigation for new locks and small scale and nonstructural measures authorized under this Act.
Directs the Secretary to modify the operation of the Upper Mississippi River and Illinois Waterway System to address the cumulative environmental impacts of operation of the system and improve the ecological integrity of the Upper Mississippi River and Illinois River.
Directs the Secretary to carry out ecosystem restoration projects to attain and maintain the ecosystem of the Upper Mississippi River and Illinois River in accordance with the general framework outlined in the preferred integrated plan contained in the Integrated Feasibility Report and Programmatic Environmental Impact Statement for the UMR-IWW System Navigation Feasibility System, dated April 29, 2004. Lists projects that may be included, such as island building, floodplain restoration, and land acquisition.
Directs the Secretary to: (1) submit implementation reports to specified congressional committees; and (2) appoint and convene an advisory panel.
Written by the nonpartisan Congressional Research Service. All summary versions on Congress.gov
About this bill and sources
Official title: A bill to enhance navigation capacity improvements and the ecosystem restoration plan for the Upper Mississippi River and Illinois Waterway System.
Latest action (May 20, 2004): Read twice and referred to the Committee on Environment and Public Works. (text of measure as introduced: CR S6003-6005)
Policy area: Water Resources Development · Origin: Senate · Introduced: May 20, 2004
Official page on Congress.gov · Bill text (GovInfo) · Status record (XML)
No recorded floor vote found.